Dundalk WwTP

Description Summary

Original build completed in 2002.  20 year O&M contract commenced in January 2004.  Installation of a sludge drier completed in 2007.

Project Title

Utility

Client

Louth County Council

Type

Wastewater Treatment

The EPS Group was contracted to build the complete Dundalk Wastewater Treatment Plant including two glass-lined steel digesters of total volume ca. 9500 m³, 2 no. CHPs of electrical output 275 kW per unit, a boiler of thermal output 1100kW and all ancillary equipment e.g. sludge heat exchangers, dump radiators, SCADA. 

We subsequently installed a complete sludge drying system and hold the contract to operate and maintain Dundalk Wastewater Treatment Plant.